PLANNING & ZONING

ABOUT PLANNING AND ZONING

The Planning & Zoning Commission meetings are held on the second Tuesday of each month at 5:00pm at the Bloomingdale City Hall located at #8 West Hwy 80. 

 

Questions regarding Building Permits or Zoning can be directed to Denise Kerby at (912)748-0970.

Email: dsullivan@bloomingdale-ga.gov

 

NOTE: All matters for discussion and/or consideration by the Planning & Zoning Commission must be submitted, in writing, to City Hall a minimum of twenty (20) days prior to the date of their meeting. This deadline was requested by the commission and approved by council on August 21, 2003.

 

REZONING REQUEST APPLICATIONS MUST BE SUBMITTED IN PROPER FORM AT LEAST SEVEN WEEKS PRIOR TO A REGULARLY SCHEDULED PLANNING COMMISSION MEETING.

2021 MEETING DATES

January 11     

February 8

March 8

April 12     

May 10

June 14

July 12    

August 9

September 13

October 8  

November 8

December 13

2021 DEADLINE 

December 19

January 16

February 23

March 19

April 26

May 21

June 21

July 23

August 20

September 20

October 22

November 22

NOTICE TO DEVELOPERS, PROPERTY OWNERS, BUYERS IN JIMMY DELOACH PARKWAY AREA

The City of Bloomingdale has been advised by Chatham County that they are in the initial stages of planning the Jimmy Deloach Parkway - U.S. 80 intersection which will likely result in the future construction of an interchange at U.S. 80. The City has been encouraged to advise developers, possible buyers of property and builders involved in projects in the area of this information.

 

If you should have any questions about the County's plans for the Jimmy Deloach Parkway, you should contact R. E. Abolt, County Manager or A.G. Bungard, County Engineer.

CITY COUNCIL

CITY HALL: 912-748-0970

Email: dsullivan@bloomingdale-ga.gov

HOURS

8:00 AM - 5:00 PM Monday - Friday

LOCATION

City Hall Building - 8 West Hwy 80

PLANNING & ZONING COMMISSION MEETINGS @ 5:00 PM

Held on the 2nd Tuesday of each month

Bloomingdale Map
 

RESIDENTIAL CONSTRUCTION

New Residential           

 

Plan Review - $150.00

 

$500.00 up to 3,000 sq. ft., plus $75.00 for each additional 1,000 sq. ft. or fraction thereof. Fee includes inspections for saw pole, two electrical, three plumbing and two mechanical fees. An additional $50.00 will be charged for footer/slab, framing, sheathing/nailing, insulation and floor framing/sub-floor inspections. 

 

Renovations

$75.00 per building, electrical, plumbing, and/or mechanical inspection as needed for the construction with the number of inspections required being determined by the building inspector at the time the plans are reviewed.

 

Mobile Home Permit

$300.00 includes mobile home/skirting inspection & one (1) electrical inspection (An electrical inspection form completed by a licensed electrician should be turned into City Hall when the water, sewer, and electrical connections are complete. Once the inspection has been made and approved, the City will release thirty (30) day temporary power to the electric company to allow time for the mobile home to be skirted. All mobile homes must be skirted. After the skirting has been completed, inspected, and approved the City will issue a release for permanent electric power.)

COMMERCIAL CONSTRUCTION

New Commercial      

 

Plan Review $300

Renovation/Tenant Build-out Plan Review $150.00

 

$500.00 up to 3,000 sq. ft., plus $75.00 for each additional 1,000 sq. ft. or fraction thereof for the building construction only.

 

Fee does not include electrical, plumbing, or mechanical inspection fees.

  • Electrical inspections - $60.00 per inspection

  • Plumbing inspections - $60.00 per inspection

  • Mechanical inspections - $60.00 per inspection

  • Re-inspections - $50.00 per inspection

 

The fees for electrical, plumbing, and mechanical inspections will be paid by the general contractor at the time the building permit is obtained.

 

OTHER CONSTRUCTION PERMITS

  • Fences & Walls - $50.00, plus building permit for fences and walls exceeding 6’ in height

  • Garage/Storage Building (free-standing)* $100.00

  • Additional inspections - $30.00 each

  • Electrical inspections - $60.00 each

  • Swimming Pool - $100.00 includes plan review and one building inspection; $30.00 for each additional inspection, $60.00 for each electrical

  • Signs - $75.00 per sign, plus seventy-five (75) cents per square foot of sign face for each sign or other advertising

  • Demolition - $200.00

  • Utility Buildings (portable)* $30.00 up to 150 sq. ft., plus $5.00 per 100 sq. ft.

 

*Note: Any building permit for an accessory building over 500 sq. ft. of “enclosed area” requires approval from the Mayor and City Council. The request must be accompanied by plans showing the dimensions and floor plan of the building. The plans should include details of how the building will look from the front, rear, and sides and the materials that will be used in its construction. 

OTHER INSPECTION FEES

Re-inspection Fees

$50.00 per building, electrical, plumbing, and/or mechanical inspection. Re-inspection fees must be paid before the City will release final electrical power and/or the certificate of occupancy.  

 

Electrical Saw pole only $50.00

 

Electrical only inspections $60.00 each

All electrical inspection requests must be accompanied by an inspection slip to be completed by persons performing the electrical work. Note: A homeowner is allowed to do the electrical work on his own residence provided he will be living there, but he must complete, sign, and submit an electrical inspection form to City Hall when requesting an inspection. All other electrical work must be done by a state certified electrician. All electrical fees must be paid before electrical work will be released to the power company.

Inspection fee for temporary electrical service $75.00

A temporary electrical service request may be made to the City provided all electrical, plumbing, and mechanical work has been completed and the inspection forms have been submitted; however, release of the electrical service will be at the discretion of the building inspector based on his findings when his inspection is made. If a temporary release of the electrical service is approved by the building inspector, the electrical service will be released for a period of up to thirty (30) days. The building cannot be occupied until a final building/electrical inspection is made and a certificate of occupancy has been issued. 

DRIVEWAY INSTALLATION FEES

Driveways:

  • The City prefers and encourages the use of Advanced Drainage Systems (A.D.S.) pipe in the installation of driveways requiring drainage pipe for properties located within the city limits abutting city streets. If, however, a citizen wants to use concrete pipe, they can choose that option.

  • Driveways requiring drainage pipe must be installed by the City unless the City Council gives approval otherwise. Payment for installation of a driveway is due at the time the building permit is issued or, for existing home, prior to the installation of the driveway.

Note: Prior to the pouring of concrete on driveways that do not require a drainage pipe, the maintenance department must review and approve the height of the finished driveway.

  • Concrete pipe (16’ minimum driveway width)

  • $50.00 per foot – 15”*

  • $55.00 per foot – 18”

  • $60.00 per foot – 15” Elliptical concrete pipe

 

  •  A.D.S. pipe (20’ minimum driveway width)

  • $40.00 per foot – 15”

  • $45.00 per foot – 18”

  • $50.00 per foot – 24”

 

Note: The customer may shorten the width of the driveway to under 20’ with a minimum width of 16’, but must pay for the cost of a 20’ driveway.

WALKWAY INSTALLATION FEES

Walkways:

  • The minimum walkway width of A.D.S. pipe is 6½’. Other available widths are 10’ and 13½’. A walkway installed between existing pipes must be installed with the minimum size of the walkway pipe being the size of the largest pipe on either side. Walkways requiring drainage pipe must be installed by the City unless the City Council gives approval otherwise. Payment for installation of a walkway is due at the time a building permit is issued or, for existing homes, prior to the installation of the walkway.

  •  A.D.S. pipe (6½’ minimum)

  • $40.00 per foot – 15”

  • $45.00 per foot – 18”

  • $50.00 per foot - 24"